Projects

Current Projects

Water Vortex Project at Bardiya

Name of Project : Thakurdwara Vortex Micro Hydro Project

Source of River : Karnali River Stream

Location : Thakurdwara-5, Bardiya, Nepal

Gross Head : 1.5-2 m (vary on 4 different site)

Measured Flow & Date : 1500-2000 Lps (Different in 4 sites)

Design discharge : 1200 lps (11 months exceedance flow)

Power Output : 27 kW

Type of Turbine : Vortex Turbine

Gallery:

Water Vortex Project at Johannesburg, South Africa

Name of Project : Ernest Water Vortex Project 20 kW

Source of River: Hennops River

Gross Head: 2 m

Design Discharge : 1000 lps

Capacity : 10 kW

Units : 2

Past Projects

Detail Feasibility Study of Sisa Khola Project 10 kW, Solukhambu

Location : Sisa Khola, Solukhambu

Devlopers : Singadevi Sisa Khola Hydropower Pvt Ltd

Head : 1.5 m

Design Discharge : 1000 lps

Capacity : 10 kW

Type of Turbine : Vortex Turbine

Detail Feasibility Study of Sisa Khola Project 394 kW , Solukhambu

Location : Sisa Khola Solukhambu

Altitude : 2040 m from msl

Devlopers : Singadevi Sisa Khola Hydro Power Pvt. Ltd

Head : 55 m

Design Discharge : 1300 lps

Capacity : 394 kW

Type of Turbine : Fransis Turbine

Intake Location

Detail Feasibility Study of Sisa Khola Screw Turbine Project 108 kW

Location : Sisa Khola Solukhambu

Altitude : 2040 m from msl

Devlopers : Singadevi Sisa Khola Hydro Power Pvt. Ltd

Head : 5 m

Design Discharge : 1300 lps

Capacity : 100 kW

No of units : 4 units

Type of Turbine : Screw Turbine

DPR of Tila Khola Mini Hydro Power Project 951 kW, Jumla, Nepal

Location : Tila Rural Muncipality, Jumla, Nepal

Head : 25 m

Design Discharge : 5000 lps

Capacity : 951 kW

No of units : 2

Devlopers : Tila Rural Muncipality

Tila River at Winter

DPR of Hima Khola Mini Hydro Project 106 kW, Jumla

Location : Hima Rural Muncipality, Jumla, Nepal

Devlopers : Village committee of hima rural muncipality

Head : 5 m

Design Discharge : 3000 lps

Capacity : 108 kW

No of Units : 2

Types of Turbine : Screw Turbine

Hima Khola

DPR of Ruru Khola Mini Hydro Power Project 950 kW, Kalikot

Location : Ruru village in Tila Gufa Muncipality, Kalikot, Nepal

Altitude : 2340 m

Head : 250 m

Design Discharge : 500 lps

Capacity : 950 kW

No of Units : 2

Type of Turbine : Pelton Turbine

Survey Team Ruru Khola

This is an off grid electrification project in collaboration with SunHelp International of Saarbrucken, Germany. This project is funded by SunHelp International. Beside funding they also assist our Electrical Engineer Binod Kumal for installation of  the solar to Thati Village of Gorkha district. This village is in our priority in providing small capacity of electricity for the rural electrification as this village is earthquake affected region Gorkha district. We have installed 80 Watt solar PV in  15 house holds, a primary school and one conference hall. This project was installed in November, 2017 and about 250 people of the Thati Village of Gorkha district are benefited who has been abstained from electricity for ages.